In this chapter, we will provide you with the answers to the question at the end of each chapter of the ninth part or the course.
Question 1.1
(Go to the original question)
In the next part, the concept of regeneration will be introduced. Regeneration has the goal of reducing the geothermal imbalance by, for example, connecting solar thermal panels to the borefield in order to inject extra heat into it. Is regeneration also a hybrid system according to the definition used here?
No, according to the definition used in this course, regeneration is not part of the hybrid system. Hybrid technologies contribute directly to the heating and cooling demand of the building, whereas regeneration is used to balance the ground in the long term. It does not provide heating or cooling directly to the building and is therefore not considered a hybrid technology.
Question 2.1
(Go to the original question)
Why is the geothermal share in cooling lower when the domestic hot water is reduced first, compared to the simulation in which the heating demand was reduced first (both with borefields of 4×4 boreholes)?
This is entirely due to the imbalance and the difference in load profile between the heating and domestic hot water demand. Whereas the heating demand is highly variable, the domestic hot water demand (with a peak power of 30 kW) follows a very periodic pattern, as can be seen in the graph below.
When the heating demand is reduced first, the ground-source heat pump can still provide 100% of the domestic hot water, while only 13 kW of the heating demand (with an annual load of 53 MWh) is placed on the borefield. This results in an overall annual imbalance of 61 MWh towards extraction. The temperature profile is shown below.
When the domestic hot water demand is reduced first, none of the domestic hot water remains on the borefield, while 32 kW of the heating demand (with an annual load of 90 MWh) is still placed on it. This results in a smaller geothermal imbalance of only 52 MWh/year towards extraction, giving the temperature profile shown below.
Although both profiles reach the minimum fluid temperature limit of 0 °C, there is a clear difference between the two. In the first case, the minimum temperature is driven by the larger imbalance, whereas in the second case it is driven by the higher peak power. As a result, an extraction load of 83 MWh could be placed on the borefield in the first case, but only 72 MWh in the second, owing to the higher peak power. The first case therefore offered more opportunity to place a higher cooling demand on the borefield.
Question 2.2
(Go to the original question)
Controlling a hybrid system with this design approach is rather straightforward. In theory, since the ground-source heat pump (and potentially the heat exchanger as well) is designed so that its peak power is always available, the system could be controlled by simply placing as much load on the borefield as possible and switching on the hybrid technology whenever more power is required.
Question 3.1
(Go to the original question)
If the system is designed using the optimisation for maximum energy, a control strategy is required to ensure that the fluid temperature stays within the limits. This is because, in contrast to the optimisation for power, the ground-source heat pump (and/or passive heat exchanger) can be oversized in order to maximise the energy extracted from or injected into the ground. However, this power is not guaranteed to be available during the entire simulation period.
To control this hybrid system, the fluid temperatures entering and leaving the borefield should be actively measured. Whenever either of these temperatures (or their average) falls below the minimum threshold, the power of the ground-source heat pump should be reduced and the hybrid technology should take on a larger share of the building’s heating demand. The same applies, in reverse, when the maximum fluid temperature is exceeded.
Question 3.2
(Go to the original question)
In the first geothermal contribution graph in this chapter, the baseload in domestic hot water goes down, but the peak power stays the same. How is that possible?
At first glance, this might seem a strange result, but it is in fact one of the key differences between the optimisation for energy and the optimisation for power. When the peak power stays the same but the baseload decreases, this simply means that the peak power can be used some of the time, but not always.
In this case, after every cooling season, the ground is warm and 100% of the peak power can be used for domestic hot water. Later in the heating season, however, the ground has cooled down, so this is no longer possible and the available peak power is lower. Since this graph shows the maximum power occurring in each year, it is indeed constant, but the annual energy contribution decreases.
Question 3.3
(Go to the original question)
For the 5×5 borefield, a cumulative installed power of 75 kW was required to deliver the required heating load. However, when looking at the geothermal contribution graph, the geothermal peak power never goes below 45 kW. Since the heating demand is maximum 50 kW, why is the required hybrid power 25 kW?
The explanation is similar to the answer to the previous question. It could be tempting to reason that, since the geothermal power is always at least 45 kW, the hybrid technology only needs to be 5 kW. That would be correct for the optimisation for power, but not for the optimisation for energy. As mentioned, the 45 kW in the geothermal contribution graph only means that the ground-source heat pump can provide 45 kW for at least one hour of the year, not that it can do so all the time. Therefore, a larger hybrid technology should be installed.
Question 3.4
(Go to the original question)
How do the results of an optimisation for energy and an optimisation for power differ when the limits in heating, cooling and domestic hot water are set identical to the results of the optimisation for power?
In that case, the results would be identical for both optimisations. Because neither the ground-source heat pump nor the passive heat exchanger is oversized, no more energy can be exchanged than in the optimisation for power.
Question 4.1
(Go to the original question)
The control strategy for a system optimised for maximum balance is essentially identical to that for the optimisation for power. This is because the algorithm picks the power such that the resulting imbalance, given the load profile, stays within your acceptable imbalance of x %.
However, if your load profile is (significantly) different from the one used in the simulation, it is advisable to also keep track of the imbalance in the ground by measuring the energy extracted from and injected into the ground. If this exceeds the allowed imbalance, the control strategy can actively shift more of the load to the hybrid technology.
Question 5.1
(Go to the original question)
Can you explain why a simulation with only a maximum geothermal power is not really a hybrid-first approach?
When you design a hybrid system based on an outdoor temperature threshold, the load will first go to the hybrid technology and only afterwards to the ground-source system. That is why this approach is called hybrid-first. When working with only a maximum geothermal power, you limit the geothermal power by putting part of the load (namely the power that is more than the set threshold) on the hybrid technology a priori, which also makes it a hybrid-first approach.
However, another way of looking at this is that the algorithm puts as much load on the borefield as possible until a certain power is reached, and whatever remains goes to the hybrid technology. Defined like this, it is more of a borefield-first methodology. So, depending on how you look at the design strategy, it is either a hybrid-first or a borefield-first approach.
Question 5.2
(Go to the original question)
How does the option to limit the maximum geothermal power (in heating and/or cooling) relate to the option to set a maximum geothermal power in the optimisation methods?
Although the optimisation and simulation approaches generally give completely different results, in this case the same result can be obtained if the geothermal power limits in the simulation method are identical to the results of an optimisation for power. Ultimately, both approaches limit the maximum geothermal power, but the optimisation strategy ensures that you stay within the temperature limits, whereas in the simulation approach you may still exceed them. However, for identical power limits, the result is the same.
Question 5.3
(Go to the original question)
Why is the energy mix of the hybrid system in the example above so different when working with the temperature thresholds versus working with the limitation of the geothermal power?
This is simply due to the completely different nature of the calculation. When simulating a hybrid system, you correlate the load on the borefield with the outdoor temperature, whereas the optimisation algorithm only looks at the hourly load in and of itself. In general, the optimisation (as the name suggests) will yield a better result than the simulation approach, as it is not tied to the outdoor temperature and can therefore optimise more freely.